[scheme-reports-wg2] Re: [Scheme-reports] Installing the floor of the R7RS-large numerictower xacc.ide@gmail.com (21 Apr 2014 18:18 UTC)
Re: [Scheme-reports] Installing the floor of the R7RS-large numeric tower Christian Stigen Larsen (29 Apr 2014 08:13 UTC)

[scheme-reports-wg2] Re: [Scheme-reports] Installing the floor of the R7RS-large numerictower xacc.ide@gmail.com 21 Apr 2014 18:18 UTC

Yes to all 4.

But willing to sacrifice on 3.

Regards

leppie

--
You received this message because you are subscribed to the Google Groups "scheme-reports-wg2" group.
To unsubscribe from this group and stop receiving emails from it, send an email to scheme-reports-wg2+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.